Front brake pads Brembo for Triumph Thruxton 1200 R 16-17 Genuine parts 07BB3792
Regular Price: €85.14
Special Price €55.34
-35%
24H Shipped outFront brake pads Brembo for Triumph Thruxton 1200 R 16-17 Genuine parts SINTERED 07BB3793
Regular Price: €91.49
Special Price €59.46
-35%
24H Shipped outFront brake pads Brembo for Triumph Thruxton 1200 R 16-17 LA Road 07BB37LA
Regular Price: €73.79
Special Price €47.96
-35%
24H Shipped outFront brake pads Brembo for Triumph Thruxton 1200 R 16-17 RC extreme racing 07BB37RC
Regular Price: €107.02
Special Price €69.56
-35%
24H Shipped out
Details
BMW S 1000 XR 2020-2022: Pinza Brembo / Brembo Caliper
Please Note that every product is a set of pads for 1 caliper therefore for 1 disk, so if your bike has two front disk the right quantity is 2 products.
Brembo Extreme Racing "Z04" Compound Racing Pads
Brembo Racing present its range of high performing racing brake pads. These racing pads are exclusively developed for the highest levels of racing use and have been designed to give top performances in extreme situations. The main features are a highs braking control, a more stable system, an increase in braking power, resistance to higher temperature and low wear.
The pads are easly to bed.
Brembo Racing Z04 compound is used in the world Superbike & Supersport Championships and are now available for Supertock, Motocross and Supermotard applications.
NOT FOR HIGHWAY USE.

- Compatible model years
- Triumph Thruxton 1200 R 2016
- Triumph Thruxton 1200 R 2017
- Triumph Thruxton 1200 R 2018
- Triumph Thruxton 1200 R 2019
For your moto
Moto Parts
Alu7075 accessories
Fairings & Carbon parts
Wheels and tyres
Controls and levers
Windscreens & windshields
Brakes
Garage & Track
Electrical parts
Engine parts
Frame parts
OFF-ROAD plastic kits
License plate holder
Protections
Exhausts
Seats & seat covers
Shocks
View mirrors
Trasmission
Products for all Moto
Off-Road accessories
Race accessories
Touring accessories
Accessories Handlebars
Accessories Electronics
Accessories Brake M.C.
Action Camera
Stickers and Tank pads
Anti-theft and Disc Lock
Tools and equipment
Batteries
Chargers and accessories
Chain
Stands & Ramps
Quick throttle controls
Indicators
Lights & Universal light
Grips
Handlebars
Merchandising & Gadgets
Oil for your bike
Brake calipers
Universal plastics
Tyres
Clutch pump & control
Front brake Master cylinder
Rear brake Master cylinder
Clean and care
Spare parts carburetors
Spare parts
Spare parts for exhaust and silencers 2T
Suspension parts
Exhaust SC-Project
Racing bars
Mirrors
Electronic equipment
Tyre warmers
Transporting bikes
Bolts
Gift card 
Oil
Motor oil 4T
Motor oil 2T
Chain lube
Fork oil
Brake fluid
Air Filter oil
Coolants
Sintoflon products
Lubrificant & Degreaser
OFF ROAD gear
Helmets Off-Road
Trial Helmets
Junior Helmets
Off-Road Goggles
Lens and Accessories's Goggles
Gloves
Jersey
Pants
Junior Clothing
Boots
Junior Boots
Socks
Chest Protector
Knee guards
Neck protections
Elbow & shoulders protections
Back protectors
Junior protections
Technical Clothing
Jackets
Rainproof
Clothing cleaners and detergents
Bag and Backpack
Waist packs
Camelbak Hydration Packs
ROAD gear
Helmets full face
Helmets touring and modular
Helmets jet and demi-jet
Junior Helmets
Road gloves
Women' s road gloves
Racing Boots
Touring Boots
Women's boots
Shoes
Women's shoes
Road jackets
Road pants
Technical Clothing
Back protectors
Knee sliders
Rainproof
Casual Clothes
Helmet Garmet bags
Clothing cleaners and detergents
Shoes motorcycle
Bike
Bike Helmets & Clothing
Bike Accessories
Tools & Maintenance Bike
Parts & Components Bike
Gift Card 


































