0

You have no items in your shopping cart.

MotoRacingShopClose
 

Product was successfully added to your shopping cart.
Braking
Front brake pads Braking for MV Agusta Brutale 675 ABS 15-17 CM66 semi-metallic racing 784CM66
Front brake pads Braking for MV Agusta Brutale 675 ABS 15-17 CM66 semi-metallic racing 784CM66 Front brake pads Braking for MV Agusta Brutale 675 ABS 15-17 CM66 semi-metallic racing 784CM66

Front brake pads Braking for MV Agusta Brutale 675 ABS 15-17 CM66 semi-metallic racing 784CM66

Price refers to pads for one brake caliper

Product code: 784CM66_ant_dpp_22

Availability: In stock

Regular Price: €84.18

Special Price €59.77

-29%

€84.18

€59.77

-29%

Previous price €59.77
Buy it and receive a DISCOUNT VOUCHER
CASH BACK MotoRacingShop

1) For every order over € 20 you will receive a DISCOUNT COUPON equal to 5% of the amount spent (excluding shipping costs, products in special deal and with a reserved CLUB price)

2) You will be able to use the DISCOUNT COUPON on your next order

3) The DISCOUNT COUPON will be sent to you 3 days after your order has been delivered

4) The DISCOUNT COUPON is valid for 30 days from the moment you receive it

For full Terms and Conditions click here

Warning! You are ordering an item that is not available
Notify me when it's back in stock
Notify me when it's back in stock
Enter your email, we will notify you as soon as the product becomes available again from the supplier.
Subscription successful Error on the procedure
Similar products
Similar products
Back to product

Delivery time

In the SHOPPING CART you will find the estimated shipping date for your order.

The ORDER will be shipped when all the products are ready.



When the product is not available from manufacturer/supplier, or when the product is on request and the manufacturer need to produce it, delivery time can may vary and will be communicated to you by our order department when taking charge of the order.

Check compatibilty with your motorbike
Return
Easy
Compatibility
Guaranteed
Size change
No problem
Shipping
Express
100% secure payments
Similar products
Description

Details

Please Note that every product is a set of pads for 1 caliper therefore for 1 disk, so if your bike has two front disk the right quantity is 2 products.

Below you will find a description of all the various compounds available, obviously the selected pads will be characterized by one of these compounds, and this is highlighted in the product title.


STREET

CM55&CM56
Sintered pad for use in multiple conditions. It offers consistent braking performance and reduced wear. Compound not suitable for racing use.
Good performance and durability for multiple conditions of use.

P50
Sintered metal brake pad for a wide range of conditions. Provides stable braking performance and low wear rate. Compound not suitable for racing use.
Good performance in most conditions.

SM1
Semi-metallic base compound with soft, powerful and friction-free performance. Replacement suitable for original applications. Compound not suitable for racing use.
Good performance at low temperatures and competitive price.



RACING

CM66
Braking's historic racing pad with the strongest bite. Limited duration
Great initial grip and high level of friction.
NOT APPROVED FOR ROAD USE

PR1
SBK class racing pad with the best bite durability performance.
High performance in any condition and high durability.
NOT APPROVED FOR ROAD USE




OFF-ROAD

CM44
Sintered brake pads for multiple conditions of use (mud or sand, sun or rain). It offers consistent braking and reduced wear both on the track and for off-road use
Good result in multiple conditions and guaranteed long life.

CM46
This compound offers powerful, constant and fade-free braking performance even in extreme racing conditions, a perfect combination for Batfly model discs.
Consistent performance at both low and high temperatures and great resistance to fading.

SM1
Semi-metallic base compound with soft, powerful and friction-free performance. Replacement suitable for original applications. Compound not suitable for racing use.
Good performance at low temperatures and competitive price.



SCOOTER

CM55
Sintered pad for use in multiple conditions. It offers constant braking performance and reduced wear. Compound not suitable for racing use.
Good performance and durability for multiple conditions of use.

P30
Pad with cutting-edge sintered technology for a perfect balance between performance and durability.

SM1
Semi-metallic base compound with soft, powerful and friction-free performance. Replacement suitable for original applications. Compound not suitable for racing use.
Good performance at low temperatures and competitive price.


Compatible model years
MV Agusta Brutale 675 2015
MV Agusta Brutale 675 2016
MV Agusta Brutale 675 2017
Spare part compatible with
Reviews
Product Questions
No Questions
Google Review Widget

The reviews are not verified.

Google Review Widget

The reviews are not verified.